Complex Multi-site Installation
The programme spanned three Sydney locations over 12+ months, encompassing fixture manufacturing of over 500 styles across Bondi, Burwood and Chatswood. Each site presented distinct floorplates and spatial requirements, demanding rigorous coordination between design intent, manufacturing precision and on-site execution to ensure premium presentation, consistency and programme efficiency at scale.
End-to-end Fixture Delivery Management
Through The Lab, our in-house manufacturing facility, we led extensive shop drawing development, material sourcing and matching, furniture procurement and full installation oversight. Integrated collaboration across design, manufacturing and site teams ensured rigorous quality control and sequencing efficiency, tightly aligning fabrication with on-site delivery to maintain programme momentum across concurrent locations.
Scaled Execution With Precision
Across Bondi, Burwood and Chatswood, the programme delivered more than 500 fixture styles and 3,000 manufactured units — forming a substantial store fixture roll-out within a 12-month timeframe. The result is a cohesive, elevated retail environment that reinforces David Jones’ premium positioning while demonstrating greater group’s capability in complex, large-scale implementation.